[Annual Workshop] EGNOS services status

Wednesday, October 30, 2019

Teodoro Seoane, from ESSP, presented in the Annual EGNOS workshop the EGNOS system status and performance for the period of 18 April 2018-July 2019, as well as the results of the latest User Satisfaction Survey. In this period, the EGNOS Signal in Space was available at all times, and the observed Safety of Life performances covered practically the entire SDD commitment, with the exception of some small areas in the east and south-east (video). In any case, no airports with EGNOS LPV or LPV200-based approaches were affected. During this period, there has been a significant LPV200 coverage extension to the north, and both LPV200 and APV-I commitments reached 72° North thanks to the modification of the EGNOS MT 27. The observed Open Service and EDAS performances exceeded the commitment. The latest survey results were presented, with a global satisfaction score of 8.3, consolidating an uptrend in the satisfaction level since 2014. In general, most of the evaluated areas improved with respect to the 2017 results. Presentation available in this link.